Informations et ressources scientifiques
sur le développement des zones arides et semi-arides

Accueil du site → Projets de développement → ONG/NGO Coopération décentralisée → Kenya → Kyamwalye Community A (Kenya)

2021

Kyamwalye Community A (Kenya)

Kenya

Titre : Kyamwalye Community A (Kenya)

Pays : Kenya

Date : 2021

Project Type : Dug Well and Hand Pump
Program : Southeastern Kenya WaSH Program

Description
Kyamwalye community is a largely populated area that is home to more than 1,400 people. The area is in a quiet rural location with sloping terrain. Most of the roads leading to the location are dry weather roads, with limited tree coverage made of indigenous tree species. On an average day for community members here, the women and children wake up at 6:00 am. First, women prepare breakfast for the family while children get ready for school. Then, the women head to the river to get water for their families’ use, either using donkeys or carrying it on their backs. Community members depend on scoop holes in the Kaiti River for all their water needs. The scoop holes dug into seasonal riverbeds are shared by people and wild animals, exposing the water in the open holes to contaminants that cause waterborne illnesses. The water points are prone to drying up during the driest months of the year when there is no rain, which makes the community even more vulnerable to water challenge

Our main entry point into Kyamwalye Community has been the Kyeni Kya Kiianzou Self-Help Group, which is comprised of households that are working together to address water and food scarcity in their region. These members will be our hands and feet in both constructing water projects and spreading the message of good hygiene and sanitation to everyone. This particular hand-dug well will be built adjacent to a sand dam project, which will supply clean drinking water once it rains. We have supplied the group with the tools needed for excavation. With the guidance of our artisans and mechanics, the excavated well will be cased, sealed with a well pad, and then finished with a new AfriDev pump.Excavation takes a month or more on average, depending on the nature of the rock beneath. Construction of the well lining and installation of the pump takes 12 days maximum. The well will be lined with a concrete wall including perforations so that once it rains, water will filter in from the sand dam.

This well will bring clean water closer to families.

Impact : Project Sponsor – StossWater
Functionality Status : In Service - Oct 2021

Contributors : Project Sponsor – StossWater

The Water Project

Page publiée le 29 octobre 2021