Informations et ressources scientifiques
sur le développement des zones arides et semi-arides

Accueil du site → Projets de développement → ONG/NGO Coopération décentralisée → Kenya → Nduumoni Community C (Kenya)

2021

Nduumoni Community C (Kenya)

Kenya

Titre : Nduumoni Community C (Kenya)

Pays : Kenya

Date : 2021

Project Type : Dug Well and Hand Pump
Program : Southeastern Kenya WaSH Program

Description
The Wathanaa Self-Help Group is found in Nduumoni village, Kenya. The area is a rural, fairly vegetated, and peaceful region. It is sparsely populated, with most houses made of bricks.The 2,875 community members here suffer a lot during the dry seasons because of their community’s lack of water. An average day for the community members starts at the crack of dawn when women walk to the riverbed. All roads here lead to the Nduumoni River, where people go to fetch water for the day.
The distance covered by some community members to access the river is very far, meaning they have an exhausting daily walk back and forth while carrying their heavy water containers on their backs. Because water levels in the early morning are generally higher than later in the day, once the women arrive at the river, they collect the water and return home as quickly as possible. The river, however, dries up quickly each dry season. People have to dig very deep scoop holes into the riverbed to access water for much of the year. The scoop holes are usually overcrowded because the water table is shallow, and typically only one scoop hole has water at a time. Hence, on any given day, the entire community may be depending on a single scoop hole for water.

This particular hand-dug well will be built adjacent to a sand dam project, which will supply clean drinking water once it rains. We have supplied the group with the tools needed for excavation. With our artisans and mechanics’ guidance, the excavated well will be cased, sealed with a well pad, and then finished with a new AfriDev pump. Excavation takes a month or more on average, depending on the nature of the rock beneath. Construction of the well lining and installation of the pump takes 12 days maximum. The well will be lined with a concrete wall including perforations so that once it rains, water will filter in from the sand dam.
This well will bring clean water closer to families.

Impact : 350 Served

The Water Project

Page publiée le 28 octobre 2021